0.3 Mwp

Sindos 300kWp

PV plant of 0.3MWp which was installed at the area of Thessaloniki in North Greece. The plant was installed using Yingli PV modules, Alumil PV structures, SMA inverters and ABB LV/MV substation. The installation took place on a curded industrial roof taking advantage of its south orientation. The plant was constructed during Jan2013-Marc2013 and was connected to the grid at 15 March 2013
Total Capacity
0.3 Mwp
Number of PV modules
1200
Annual Electricity Generation
0.420 MWh